Sewer and Water Wet Tapping - pre 1992 development
Application for a new sewer connection and a new (20mm only) water supply connection (Wet Tapping) into South East Water’s system.
South East Water undertakes the connection (Wet Tapping) into the water main; the plumber is responsible to provide the service into the property from the water main, assemble and install the delivered meter.
When applying online please select the application type: Sewer Water Wet
Single Residential Only - on-line application
or
Single Residential Only - download application form (84 KB)
Download the following brochures for more information:
Tapping and Tee Insertion Procedures (180 KB)
Building or Renovating? (86 KB)
What is an Overflow Relief Gully and why is it important? (526 KB)